New data-center load request: World Gate in Fairfax, VA (100.0 MW).
- Data-center load request · 100 MW · Need stage
- Power and cooling vendors typically engage within 90 days of a new data-center load request.
GridFreeze · Virginia · public record
Everything we're tracking in this jurisdiction, straight from the public record: zoning fights, grid load, and the votes that decide what gets built.
Public record scanned
Matters
1
Governance
0
MW in pipeline
100
from the public record
1 load request totalling 100 MW (largest 100 MW)
MW entering the queue
Follow Fairfax
Get every new matter in Fairfax in your weekly brief, each one linked to the public record it came from.
Free. One email a week. Unsubscribe from any of them.
We alert the day we detect a matter. Over the last 60 days detection ran a median of 3 days from the source's own date, with a worst case of 15. Speed varies by source, and every alert prints its own measured lag so you can check it. Next business day is the engineering target.
Data-center load requests entering the grid queue.
Track Fairfax
Choose the counties and signal types that matter to your team. GridFreeze will send verified changes to your inbox and include them in your weekly market brief.
Track my marketPrefer email only? Get the weekly digest:
We alert the day we detect a matter. Over the last 60 days detection ran a median of 3 days from the source's own date, with a worst case of 15. Speed varies by source, and every alert prints its own measured lag so you can check it. Next business day is the engineering target.