New data-center load request: Flamingo in Hanover County, VA (47.0 MW).

Hanover County, VA · Load request · detected Aug 28, 2026, 5:35 PM UTC

Signal strength70/100
DEV Distribution has previously submitted a DP Request for a new substation (Flamingo) to serve a data center in Hanover County. The requested in-service date is 01/01/2029. The DP request was withdrawn. Initial In-Service Load Projected 2029 Load Flamingo Sub Summer: 47.0 MW Summer: 47.0 MW 230kV Delivery Winter: 42.5 MW Winter: 42.5 MW TEAC – Dominion Supplemental 9/08/2026

Quoted verbatim from the public record; original spelling preserved. Canonical location: Hanover County, VA.

County
Hanover
Target in service
01/01/2029
Jurisdiction type
county
Meeting date
Sep 8, 2026
Capacity (MW)
47
Need number
DOM-2024-0058
Project
Flamingo
State
VA
Status
solution

Why now

Power and cooling vendors typically engage within 90 days of a new data-center load request.

Matter history

  1. Sep 8, 2026 · Load requestscheduled, hasn't happened yet

    New data-center load request: Flamingo in Hanover County, VA (47.0 MW).