Worth a lookNew data-center load request: Barrister in Loudoun County, VA (290.0 MW).
Loudoun County, VA · Load request · detected Aug 11, 2026, 3:18 PM UTC
Signal strength80/100
“DEV Distribution has submitted a DP Request to install two additional transformers (TX#1 and TX#4) at Barrister Substation in Loudoun County, VA. This upgrade is required to serve data center load with a total expected load of 290 MW. Expected in-service date is May 31, 2029. TEAC – Dominion Supplemental 01/06/2026 5”
Quoted verbatim from the public record; original spelling preserved. Canonical location: Loudoun County, VA.
- County
- Loudoun
- Jurisdiction type
- county
- Meeting date
- Jan 6, 2026
- Capacity (MW)
- 290
- Need number
- DOM-2025-0078
- Project
- Barrister
- State
- VA
- Status
- need
Why now