Worth a lookMesa, AZ Design Review Board: DRB25-00686 "Redhawk - Phase 3" (Agenda Ready).
Mesa, AZ · Rezoning / zoning · detected Aug 14, 2026, 8:08 AM UTC
Signal strength75/100
“DRB25-00686 "Redhawk - Phase 3" 187± acres located at the northwest corner of South Sossaman Road and East Elliot Road. Design Review of a Data Center. (District 6) Staff Planner: Charlotte Bridges”
Quoted verbatim from the public record; original spelling preserved. Canonical location: Mesa, AZ.
- Governing body
- Design Review Board
- Introduced
- Oct 7, 2025
- Jurisdiction
- Mesa
- Bill / file number
- DSN 25043
- Matter type
- DSN Presentation
- Meeting date
- Oct 7, 2025
- Project
- DRB25-00686 "Redhawk - Phase 3"
- State
- AZ
- Legislative status
- Agenda Ready
Why now
A rezoning or special-exception filing signals a project entering the approval pipeline, usually 6 to 12 months ahead.