Worth a lookNew data-center load request: Auto World in Loudoun County, VA (100.0 MW).
Loudoun County, VA · Load request · detected Jun 16, 2026, 7:48 AM UTC
Signal strength70/100
“DEV Distribution has submitted a DP Request for a new substation (Auto World) to serve a data center campus in Loudoun County with a total load in excess of 100 MW. Requested in-service date is 06/15/2026 12/17/2027. Initial In-Service Load Projected 2030 Load Summer: 26.0 MW Summer: 282.6 MW Winter: 0.0 MW Winter: 78.1 MW TEAC – Dominion Supplemental 04/07/2026 9”
Quoted verbatim from the public record; original spelling preserved. Canonical location: Loudoun County, VA.
- County
- Loudoun
- Target in service
- 06/15/2026
- Meeting date
- Apr 7, 2026
- Capacity (MW)
- 100
- Need number
- DOM-2023-0031
- Project
- Auto World
- State
- VA
- Status
- solution
Why now
Power and cooling vendors typically engage within 90 days of a new data-center load request.