New data-center load request: Severn in Loudoun County, VA (100.0 MW).

Loudoun County, VA · Load request · detected Sep 25, 2026, 6:03 PM UTC

Signal strength70/100
“DEV Distribution has previously submitted a DP request for a new substation (Severn) to serve a data center complex in Loudoun County with a total load in excess of 100 MW. Requested in-service date is 10/01/2027. The DP request was withdrawn. Initial In-Service Load Projected 2028 Load Summer: 45 MW Summer: 90 MW Winter: 0 MW Winter: 90 MW TEAC – Dominion Supplemental 10/06/2026”

Quoted verbatim from the public record; original spelling preserved. Canonical location: Loudoun County, VA.

County
Loudoun
Target in service
10/01/2027
Jurisdiction type
county
Meeting date
Oct 6, 2026
Capacity (MW)
100
Need number
DOM-2024-0017
Project
Severn
State
VA
Status
need

Why now

Power and cooling vendors typically engage within 90 days of a new data-center load request.